Sunday, April 26, 2009
New Video
Just a short note to inform you guys that the video bar has been updated. Onno sent a great clip of his Trussdolly working on a short film Really cool stuff so check it out. And keep the comments coming on the previous post too!
Saturday, April 25, 2009
Picking Up the Pieces
Recently, our show had a "double up day." For those of you unfamiliar with the term, it just means a separate unit is formed using whichever DP is off that week and they shoot scenes from an earlier episode that we didn't get to. It's not really a second unit, but rather an alternate 1st unit. Anyway, the Dolly Grip we brought in is an old friend and a really good Dolly Grip. We got to talking and he brought up an issue we've all had to deal with- picking up after yourself. He said he had worked with a crew recently who refused to help him keep up with his parts. To the point of being forbidden to help him by the department heads. We've all dealt with this to one degree or another. The bottom line is, we don't always have time to run back behind and pick up all the low modes, risers, lifting handles, etc that we set to the side as we're working. We try, but sometimes it's impossible. Our day consists of an endless rotation of watching rehearsals, getting marks, laying track, shooting, and doing it all over again. There's barely even enough time to take a leak before the next marks are being laid down. Dolly equipment is grip equipment, that's why it rides on the grip truck. Why a crew would create such a frictional situation is beyond me. We depend on the guys to help us keep up with the two dollies and carts worth of gear we have to lug around and use. If there happens to be a shot on sticks, or something besides a dolly, I'll usually scout around and try to round up my parts, but this is a rare occurance. It's completely unreasonable to ask the one guy who never gets a break, who's always behind camera while the other guys are sitting at the carts, to also be solely responsible for everything associated with the dollies. If you're a department head who takes this position, you're being ridiculous. There just isn't time. And you try telling the DP that you can't get marks right now because you have to go back and find your seat riser. Now, that being said, this is where a B Camera Dolly Grip becomes invaluable. It kind of falls to him, since his dolly doesn't usually work every shot, to assist the A Camera Dolly Grip in keeping up with his stuff and helping move it to the next location. I don't think this is originally how this was meant to turn out (I work with some B Camera Dolly Grips whose A Camera resumes would put mine to shame) it just logically evolved to that point. I did it for years, schlepping the dance floor out of the house at wrap while the A Dolly Grip drank a frosty beer on the truck. It's just part of the deal. So guys, give us a break, we're counting on you.
PS- Before the comments start rolling in, I want to qualify the preceding post by saying that this is not an excuse to be lazy. I try to keep up with everything and always attempt to put a piece aside where I can easily remember it and throw it on the dolly as I'm moving to the next location. I am notorious (or used to be, I'm actually much better now) for misplacing or forgetting parts so I've had to learn to be extra careful in putting them in easy to spot places rather than just flinging them wherever it's convenient- that's not fair to the rest of the crew. They have other work to do also besides picking up after the Dolly Grip. They don't mind helping, the good ones understand our predicament. But it's unreasonable to ask them to go on a scavenger hunt after every set-up. I'm just saying....it goes both ways. Be considerate or you may find yourself spending hours looking for that 12" riser on your own.
PS- Before the comments start rolling in, I want to qualify the preceding post by saying that this is not an excuse to be lazy. I try to keep up with everything and always attempt to put a piece aside where I can easily remember it and throw it on the dolly as I'm moving to the next location. I am notorious (or used to be, I'm actually much better now) for misplacing or forgetting parts so I've had to learn to be extra careful in putting them in easy to spot places rather than just flinging them wherever it's convenient- that's not fair to the rest of the crew. They have other work to do also besides picking up after the Dolly Grip. They don't mind helping, the good ones understand our predicament. But it's unreasonable to ask them to go on a scavenger hunt after every set-up. I'm just saying....it goes both ways. Be considerate or you may find yourself spending hours looking for that 12" riser on your own.
Sunday, April 19, 2009
Don Schisler- Rest In Peace
A really good and talented man passed away recently. Don Schisler was an engineer, designer, and insert car driver that I, and the whole Atlanta community, worked with for years. The guy was brilliant and truly one of the nicest men you could ever meet. I spent many hours talking with him over the years and he was kind of a mad scientist in a trucker hat. He was always thinking of ways to adapt everyday things to the film business and I remember at one point had modified fire trucks to be used as lighting platforms. The last thing I remember him talking about (around 1995) was an "All titanium dolly," honest. I didn't realize how long it had been since I'd seen him until I got an email last week informing me of his passing. I remember he was once late to work with an insert car because he saw a lady stranded on the interstate. A truly good man. We'll miss him. So long, Don. See you on the other side.
Saturday, April 11, 2009
My GI Track Experience and a Visit from Wick
As I mentioned earlier this week, Gil at GI Track was kind enough, along with the guys at General Lift in LA, to arrange for us to have a few sticks of GI Track to try out. Our plan ha been to use it on some exteriors and put it through it's paces on a few shots. As it happened, the night we had it turned out to be all handheld and Steadicam, so I was relegated to running back to the truck in my downtime and trying it out without actually using it. The first question I wanted to answer was, how does it lay? I had three 8' and one 4' so I laid them out in a field with a slope. The track has a bigger profile than most track. It sits on an I-Beam which is, I guess about 3 inches high by three or four across. The latches are on the side rather than on the cross ties and I really like this feature. The track is really well constructed. It wedges really well and lays easily due to the wider surface of the beam. The only thing I would change on it is the actual engagement of the hook on the latches. The hook fits into a hole and tightens rather then grabbing onto a nub. I'm not crazy about this feature, but it's easily modified (plus, we had an early batch of it so it may be different now)Update- I spoke to Gil and his latches have been changed to stainless steel, much nicer than the one's we had on the first run track.. Once levelled, we put the caps on and threw both dollies on it. At first, there was a lot of friction between the Hustler wheels and the caps, but we actually just let the caps get water on them and it immediately loosened up. We also realized we hadn't properly staggered all the caps (it was a little dark by now). Once these bugs were worked out, it really began to perform. I can honestly say it's one of the smoothest rides on just dolly wheels I've ever had. Once the seams in the caps are staggered correctly it's pretty flawless and you could easily do a tight lens move on it without the skates. It does take a little more set up because of the caps, but after your crew got used to it, the time would probably be negligeable (plus, it wedges so much easier than Filmair track, that you'd probably come out about the same). I know a couple of guys who have bought it and I really want to get their impressions (Moose? are you out there?) and I know our own Azurgrip is a user. Overall, it's an ingenious system and really well made. I wish I could have spent more time with it to see how much time I could cut out of the lay, but I wanted to get it back to the owners before they needed it. I'll let Azurgrip give some more firsthand info if he wants to. The beauty of it is, if a cap gets damaged, it's easily replaced, unlike the fragile aluminum track we all deal with regularly. So visit the website gitrack.com and check it out. Ask questions. Gil is a great guy and will answer any you may have.
Also, Wick was in town at Fisher last week. He came by set and we had a little while to visit. We did some catching up and he told me about new things going on at Fisher. They're adding a new dampening system to their boom controls which should make it more intuitive for those of us who are not regular Fisher users. Also, he had some flyers for the Fisher Open House on Saturday May 16th at JL Fisher. The address is 1000 West Isabel St. in Burbank, CA 91506. There will be exhibits from different companies as well as facility tours by Jim Fisher and a Moving Camera Seminar from 2:00 to 3:30 PM. The whole thing starts at 10:00 AM and goes to 4:00 PM. Please go check it out. I'm going to try and make it myself if I don't have my daughter that weekend. It should be a really informative and good time.
Had an 80 hour week so I'm whipped. Drop a line and say hi.
D
On another note, the forum is not coming up for some reason. I've contacted Bravenet and am waiting on a solution. Bear with me.
Also, Wick was in town at Fisher last week. He came by set and we had a little while to visit. We did some catching up and he told me about new things going on at Fisher. They're adding a new dampening system to their boom controls which should make it more intuitive for those of us who are not regular Fisher users. Also, he had some flyers for the Fisher Open House on Saturday May 16th at JL Fisher. The address is 1000 West Isabel St. in Burbank, CA 91506. There will be exhibits from different companies as well as facility tours by Jim Fisher and a Moving Camera Seminar from 2:00 to 3:30 PM. The whole thing starts at 10:00 AM and goes to 4:00 PM. Please go check it out. I'm going to try and make it myself if I don't have my daughter that weekend. It should be a really informative and good time.
Had an 80 hour week so I'm whipped. Drop a line and say hi.
D
On another note, the forum is not coming up for some reason. I've contacted Bravenet and am waiting on a solution. Bear with me.
Mothman Prophecies
I spent 17 hours travelling after a 13 hour shooting day today, so I'm procrastinating a little. I got home at 4 am, poured myself a drink, and popped in one of my favorite dvd's (since my sattelite tv is out). Mothman Prophecies is, to me, a really terrifying piece of work. Beautifully shot by Fred Murphy, and featuring gorgeous crane work by my old friend Rich Kerekes, it's a movie that should come off as hokey but somehow doesn't. The atmosphere created in this movie just gets me every time I watch it.I know most of the guys that worked on this movie in both the electric and grip dept, as well as Fred, and they blew me away. I tend to have pretty eclectic ideas about horror movies (I like Signs, I like Reign of Fire, my wife rolls her eyes) and this one affected me in a way that no other has done in years. This one's just creepy. And it shouldn't be.When you're watching it, you can't believe that you're somehow buying it, but you do. The story is hokey. The acting is cheesy. But it's so artfully made that it affects me and I pop it in whenever I need a good scare. Rich did great work behind the sled and on the crane and the bridge sequence just gets me every time. It's not to everyone's taste, but you can't deny the craftsmanship. I love it. "Wake up number thirty-seven" Check it out.
Coming up, when I sober up, a GI Track review and comments!
Coming up, when I sober up, a GI Track review and comments!
Saturday, April 04, 2009
Hi Guys!
I so apologize for my lack of posting but between work and a damaged roof on my house in Atlanta, I haven't had much spare time. I just came off an allnighter and am trying to recover (it gets harder every year). Alexa- I always love hearing from you. You ask great questions and are obviously going places. I got your email and will answer, I promise, when I have more time. Wick is in town and I'm going to try to get together with him this week, even if I can just get him out to set. Otherwise, I'm trying to spend some down time this weekend and recuperate before it all starts up again. Thank all of you for your contributions to this page and for reading. Once I get caught up on real life, I'll be back with a real post. Oh yeah, we tried out a few pieces of GI Track this week, thanks tro Gil and the guys at General Lift. It worked great and I'll give you a call, Gil, later this weekend. Please visit Gil's website at gitrack.com and check it out. It really does ride like a dream. That's all for now. I'll try and catch up later this week.
D
D
Monday, March 23, 2009
Sunday, March 22, 2009
Dance Floor Update
My show involves a lot of dance floor work (for those of you not in the industry, dance floor is just a surface that you put down when you are doing a move in more than one direction) This week was dance floor helL. Strangely, a lot of our sets have rooms that are weird measurements. A lot of the spaces measure out to be 7'6", or 3'9" wide, which most of you know is an incredible pain. We also have a lot of 800lb dressers and 400lb oddly shaped sofas. I have spent the week piecing together floors and frankly I'm exhausted. The easiest solution in a floor situation is always just to lay a "pad" which means basically lay a square (or rectangle) that covers all the marks you need to hit. My lumber package generally includes five 4x8's, two 4x4's, two 2x8's, and two 2x4's. I hate pie pieces and think they're useless. I also had some doorway pieces made at 28" and a 1' by 8' piece. There's always one set, though, that just beats you up and during the blocking as the DP holds the finder at one spot you're thinking, "No. not there, just go one more foot left." I even had to do one shot that the operator started on a slider as I pushed in and then he finished it on the slider (window seats suck).The thing is, I actually relish the idea of the challenge. It's really making a better Dolly Grip out of me and it's good in a way to sharpen your skills on the old tv grindstone again. I realize that I've really gotten soft on feature work where you have a lot more time to set up and plan a difficult shot as opposed to the DP asking you,"Can you get the camera here?" after one half-ass run through. My stock answer is, "Yeah, we'll figure something out." So far, I haven't had to have any special cuts made (other than shaving an inch off the bottom of a door). I've been riding a lot of edges on one wheel this week. Please forgive any spelling mistakes as I am now 3 vodka -and -ginger- ales into my weekend. Don't judge me. I earned it.
Wednesday, March 18, 2009
Dropping In
Just dropping by before I head off to spend the evening somewhere in a canyon out towards Malibu. I'll have an actual post this weekend. Meanwhile, we have some cool things planned for Dollygrippery when we get time to actually do them. Hope all you guys (and girls) are working. Stay safe.
For those of you not actually in the business who are just interested, Michael Taylor over at hollywoodjuicer.blogspot.com has a great piece that pretty much sums up a day on a tv series from a juicer's perspective. Go give it a read and tell him I sent ya.
D
For those of you not actually in the business who are just interested, Michael Taylor over at hollywoodjuicer.blogspot.com has a great piece that pretty much sums up a day on a tv series from a juicer's perspective. Go give it a read and tell him I sent ya.
D
Monday, March 09, 2009
Your Camera Operator and You Part 2
Hi guys, great comments on the previous post from some real A list guys. In reading them it made me realize some things I wish I'd brought out more in the first post (which I kept shorter than I wanted to because I ran out of time. DW asked about getting a word in after the DP says, "Just get a ______ dolly and call it a day." In a situation like this, I don't know that there's much you can say other than let him know that you would be more comfortable with another dolly. In your situation, as Key, it's entirely appropriate to do it, but ultimately he's going to get what he asks for. I'm lucky in that the Keys I work with already know my preferences and it's all addressed way ahead of shooting and rarely contested by the DP. I've even convinced some operators I know to go along with what I prefer after the fact (notice that I'm being good here and not stating a preference for one or the other). As for the rest of it, it's the age old saying of "tell me what you want, not how to do it," that grips have been repeating for 80 years.
What goes along with this as a Dolly Grip is establishing your territory right off the bat. I can always tell when I'm working with an operator who's had some bad Dolly Grips. They point out the obvious and immediately start telling you how to do everything. My stock saying is to ask them, "Who've YOU been working with?" They usually get the hint and after the first couple of shots they settle in. But you've got to be there for the discussions. If the DP and operator are off to the side discussing how to orient the dolly, stick your head in. GHB said it well in the comments, just jump into the conversation. Claim your ground. If you know what you're doing it will soon become apparent and they'll generally turn over the reins to you. The dangerous part of this is if you don't know what you're doing. If you're relatively inexperienced it's best to go along with them, and most of the time your Key will know you're a little green and he'll step in and quietly give you instructions. Some Key Grips can't leave you alone and will jump into your business, but the ones who trust you will generally only come around when you ask them for a consultation. The moves themselves are the easy part, even though they are what it all boils down to. Either you've developed the skills to execute them or you haven't. Where you earn your money (in my opinion) is in set up. I usually am calculating what I need during the blocking. Once I've decided on a course of action, I consult my operator and tell him what I have in mind and together we either continue on that path or modify it. The set up is the most important because it has to work. You can't rip up and re- lay dance floor with the actors waiting around because you didn't allow for the door to open and close in the shot or didn't factor in the length of the dolly as you approach a wall. This is where being a team with your operator will save you. He'll help you avoid pitfalls you may not have picked up on in the rehearsal or fill you in on coversations he had with the director that you didn't hear.
Gripworks mentioned that you can't really blame some operators and DPs for not trusting you right off the bat. Unfortunately, and as much as it pains me to say it, he's right. They don't know any better. I've had to tell operators, "If you'll let me, I'll help you. That's why I'm here." They're not used to a Dolly Grip already knowing how to do the shot after the first blocking, when their previous Dolly Grip was at craft services munching on a cookie. We have to show them.
I wasn't going to post again tonight but we had such great comments and Acraw got me thinking (and we wrapped early) that these are things a Dolly Grip does and a lot of them, especially the younger ones, just don't know it so it's up to us to make them aware and that will raise the level of respect that DPs and operators pay to all of us.
Ok, I'm getting off my high horse. Thanks as always for your great comments. It's great to be part of a community of such great Dolly Grips.
What goes along with this as a Dolly Grip is establishing your territory right off the bat. I can always tell when I'm working with an operator who's had some bad Dolly Grips. They point out the obvious and immediately start telling you how to do everything. My stock saying is to ask them, "Who've YOU been working with?" They usually get the hint and after the first couple of shots they settle in. But you've got to be there for the discussions. If the DP and operator are off to the side discussing how to orient the dolly, stick your head in. GHB said it well in the comments, just jump into the conversation. Claim your ground. If you know what you're doing it will soon become apparent and they'll generally turn over the reins to you. The dangerous part of this is if you don't know what you're doing. If you're relatively inexperienced it's best to go along with them, and most of the time your Key will know you're a little green and he'll step in and quietly give you instructions. Some Key Grips can't leave you alone and will jump into your business, but the ones who trust you will generally only come around when you ask them for a consultation. The moves themselves are the easy part, even though they are what it all boils down to. Either you've developed the skills to execute them or you haven't. Where you earn your money (in my opinion) is in set up. I usually am calculating what I need during the blocking. Once I've decided on a course of action, I consult my operator and tell him what I have in mind and together we either continue on that path or modify it. The set up is the most important because it has to work. You can't rip up and re- lay dance floor with the actors waiting around because you didn't allow for the door to open and close in the shot or didn't factor in the length of the dolly as you approach a wall. This is where being a team with your operator will save you. He'll help you avoid pitfalls you may not have picked up on in the rehearsal or fill you in on coversations he had with the director that you didn't hear.
Gripworks mentioned that you can't really blame some operators and DPs for not trusting you right off the bat. Unfortunately, and as much as it pains me to say it, he's right. They don't know any better. I've had to tell operators, "If you'll let me, I'll help you. That's why I'm here." They're not used to a Dolly Grip already knowing how to do the shot after the first blocking, when their previous Dolly Grip was at craft services munching on a cookie. We have to show them.
I wasn't going to post again tonight but we had such great comments and Acraw got me thinking (and we wrapped early) that these are things a Dolly Grip does and a lot of them, especially the younger ones, just don't know it so it's up to us to make them aware and that will raise the level of respect that DPs and operators pay to all of us.
Ok, I'm getting off my high horse. Thanks as always for your great comments. It's great to be part of a community of such great Dolly Grips.
Sunday, March 08, 2009
Your Camera Operator and You
I once had a camera operator at the beginning of a show ask me before a shot, "Can you do a boom and a move at the same time?" "I don't know," I replied, "can you pan and tilt at the same time?" The relationship between an operator and Dolly Grip is one of trust, or should be. Unlike operators, however, we don't really go through a system of tiers that ultimately results in being a Dolly Grip (at least not officially). There isn't a union dolly grip level where your dues are higher and you are required to work in that category. Unfortunately, sometimes the Dolly Grip is just someone who wants the extra two dollars an hour or is the Key Grip's brother-in-law. Over the years, this has resulted in Dolly Grips all being painted with the same brush. For those of us who have worked hard to learn our craft and earn the respect of our camera department brethren, this can be frustrating. We all face it. The operator or DP who insists on doing every shot with a slider because he isn't used to a Dolly Grip being able to hold an over- the -shoulder. The operator who picks which machine you'll be using on a show. I don't tell them whether to use an Arri head or a Panahead, why should I be forced to use a Fisher or Chapman when that isn't my platform of choice? I especially get irritated when a DP and Operator have a discussion pertaining to my field as if I'm not there. You know the one. The DP walks up to the operator and asks him, "What do you think, should we use the Peewee on track or go on the Hustler on floor?" And they don't even look at you. I'm not suggesting that our position is more important than it is, but generally you would think that the person who has to perform the shot would at least be consulted. This is why I think you have to assert your position from the beginning. Already be figuring out the best way to do the shot on the first blocking and when it's time, go up to the operator and tell him your opinion. It immediately shows him that you know what you're doing and establishes that he doesn't have to worry about how the dolly will be oriented on top of everything else he's got to do.
Generally, I work with the same operators on a recurring basis, as most of you do. I have three or four that I see again and again because we all work with the same DPs. I really enjoy working with them and a couple are actually good friends outside of work. They trust me and know that I'll solve most of their problems if they'll give me the space to do it. These are the guys that it's a continual pleasure to work with. I haven't actually had an operator that I didn't get along with or didn't like in years. Thankfully the real a-holes are few and far between. But we've got to raise the bar on the position of Dolly Grip. For too long I've worked with operators who told me horror stories about Dolly Grips who continually ran off the track or couldn't attach the low mode. I've had AC's tell me about guys who couldn't get within the same zip code as the marks. Strangely, you hear very few stories about bad operators. It's time that our field was recognized for the craft it is. It takes practice and dedication to master it and it's not something you learn overnight.
Generally, I work with the same operators on a recurring basis, as most of you do. I have three or four that I see again and again because we all work with the same DPs. I really enjoy working with them and a couple are actually good friends outside of work. They trust me and know that I'll solve most of their problems if they'll give me the space to do it. These are the guys that it's a continual pleasure to work with. I haven't actually had an operator that I didn't get along with or didn't like in years. Thankfully the real a-holes are few and far between. But we've got to raise the bar on the position of Dolly Grip. For too long I've worked with operators who told me horror stories about Dolly Grips who continually ran off the track or couldn't attach the low mode. I've had AC's tell me about guys who couldn't get within the same zip code as the marks. Strangely, you hear very few stories about bad operators. It's time that our field was recognized for the craft it is. It takes practice and dedication to master it and it's not something you learn overnight.
Wednesday, March 04, 2009
The $%&%# Contract
I'm going to deviate from the norm here for a minute and talk about something that concerns those of us covered by the IA Hollywood Basic contract that's up for vote. Yeah, it sucks. I'm a pretty forgiving guy and I have never asked for more than I work for. I'm not even a hardcore Union cheerleader. I have, however, been in the IA for almost twenty years and I've watched our benefits and working conditions deteriorate at a steady rate while profits rise. The new contract calls for the current 300 hour requirement for insurance to be raised to 400 hours. All right, I understand that medical costs have gone up and I understand that something has to give. I'm willing to give them that. The New Media contract is a joke. It has worse standards than the non-union shows I used to do. Interchageability of crafts (in other words, we're tools, not professional craftsmen). No minimum rates. Residuals, out the window. Then, we get a letter telling us what a great contract it is and that we should vote "yes." It's insulting. Especially in the light of the joke of an HBO contract that a lot of us are working under now that should have been renegotiated but hasn't.
Over the years I've watched producers get concession after concession and I keep getting letters telling me how great the new contract is from people who aren't standing out in the rain with me all night. Then, my OWN UNION keeps telling me that a "No vote is a vote to strike." Whose side are these guys on? I'm tired of being in a union that seems to just roll over at the whim of the AMPTP in every negotiating session. The studios are having record profits and the price of doing business for them keeps going down because we're weak negotiators. I've had it.
Rant over.
Over the years I've watched producers get concession after concession and I keep getting letters telling me how great the new contract is from people who aren't standing out in the rain with me all night. Then, my OWN UNION keeps telling me that a "No vote is a vote to strike." Whose side are these guys on? I'm tired of being in a union that seems to just roll over at the whim of the AMPTP in every negotiating session. The studios are having record profits and the price of doing business for them keeps going down because we're weak negotiators. I've had it.
Rant over.
Monday, March 02, 2009
Sorry for My Absence
Sorry for the absence of recent posts guys. I've had a really busy week of nights topped off by a really long flight home (complete with a 4 hour plane delay) last weekend and I've just been exhausted. We'll be back shortly. Azurgrip's comment on the previous post gives me an idea..... Hope you're all working and staying safe.
D
D
Thursday, February 19, 2009
Dollies Can't Move Like A Person
I should get a t-shirt that says that and wear it to work every day. By this statement I mean that you can't make upwards of 800 lbs of operator, camera, and machine change direction or stop and start as fast as a person can. Lately, I've had a couple of situations where I needed to start moving with an actor, cross a room and land with them. The problem was that they had four big steps to their mark and I had 9 feet to mine and they started off like they were shot out of a cannon. By the time I got good and going, they were already there resulting in an unmotivated dramatic push in on them at the end while I raced to catch up. Another hard trick is keeping your wheels set to hold an over- the -shoulder and going into that kind of move. You have to hold it as long as you think you can get away with before you start turning the wheels for your takeoff and hope they don't block themselves before they move. Usually actors are good sports once they realize what you need. I've never had one refuse to help out by taking a little speed off their takeoff.
I have a split at Warner Brothers tonight. It's going to be cold.
I have a split at Warner Brothers tonight. It's going to be cold.
Friday, February 13, 2009
Comments About Comments
Hi everyone. I just got in from a freezing night in a canyon where I didn't have phone service. Thanks everyone for your comments. GHB- Nailed it as usual. Great insights. Southern Grip- Just cracks me up. Thanks for dropping in but you might want to check your caps lock. Acraw- Always has something good to say. It's great to have one of the masters on here (yes I know who you are). I know I've sounded really...cynical about my show and some of it is just exhaustion. I don't want everyone to get the idea that it's just drudgery though. I am working with a guy whom I consider to be just a phenomenal operator. He really is one of the best and we work really well as a team. The DP and Key Grip are also the tops and I couldn't ask for better. Most of the problems come from higher up the chain and just make everything harder. Top that with a lot of night work and a sub standard cable rate and I tend to get a little...crabby.
A lot of my posts arise from seeing something that makes me think of something else or reminds me of a situation I have dealt with in the past, such as the AC who wants to ride every shot etc. I got an email from an AC who took me to task a little about that post. I didn't mean that the AC should never ride. Every shot is different and sometimes there's no other way. It's the ones who want to sit on the dolly on a 24 mm with a 6' push who get my dander up. Sometimes the operator has to walk a shot. I just don't like it when they do it when they really don't need to.. A big part of my job is to make it possible for them to effectively do their job. It's when they unnnecessarily make my job harder that things start to break down. Oh yeah, Sanjay, I got your email and answered it but I don't know if it went through from where I was. Thanks for the tip. Allright guys, I'm turning in. Got another freezing night ahead of me, only this time it's really supposed to rain. Great.
D
A lot of my posts arise from seeing something that makes me think of something else or reminds me of a situation I have dealt with in the past, such as the AC who wants to ride every shot etc. I got an email from an AC who took me to task a little about that post. I didn't mean that the AC should never ride. Every shot is different and sometimes there's no other way. It's the ones who want to sit on the dolly on a 24 mm with a 6' push who get my dander up. Sometimes the operator has to walk a shot. I just don't like it when they do it when they really don't need to.. A big part of my job is to make it possible for them to effectively do their job. It's when they unnnecessarily make my job harder that things start to break down. Oh yeah, Sanjay, I got your email and answered it but I don't know if it went through from where I was. Thanks for the tip. Allright guys, I'm turning in. Got another freezing night ahead of me, only this time it's really supposed to rain. Great.
D
Thursday, February 12, 2009
Operator Interference
I hate it when camera operators walk. They drag the dolly, make moves steppy, shake the camera. I can't tell if they're slowing the dolly down because they want me to go slower or because they just can't walk fast enough. Then you also have to worry about running over them while also watching actors, looking for cues, timing the shot, hitting marks, and all the other crap you have to do during a shot. It's just added drama. This leads to some creative solutions to keeping the operator on the dolly when the dolly has to be on the wrong side, or you're doing some wacky Lambda head shot. There are a lot of times when I just wish we had a set of Hot Gears. For a while every show I did carried a set (probably because the operator owned them). My operator now owns every gadget you can imagine (and invented a lot of them) but no Hot Gears. Luckily, he dislikes walking a shot as much as I do. There are some shots though, in a 12 x 12 bathroom with a boom up and a 180 and a creep in that Hot Gears would really make both of our lives easier.
Posting is a little slow now because of my schedule, but I'm trying to keep up. Appreciate the comments, keep them coming and don't forget the message forum. I'm getting ready for a long night in the rain. Bleahhh.
D
Posting is a little slow now because of my schedule, but I'm trying to keep up. Appreciate the comments, keep them coming and don't forget the message forum. I'm getting ready for a long night in the rain. Bleahhh.
D
Sunday, February 08, 2009
Go To This Link
http://www.towndrunkmag.com/2009/kabza_superhero.aspx. I got this from Nathan over at Polybloggimous. It's hysterical.
Saturday, February 07, 2009
Sorry for My Absence
Sorry I've been negligent in posting. A whole week of night exteriors in the rain will do that to you. I'll be back this weekend.
D
D
Friday, January 30, 2009
And the TV Award Goes To....
I've noticed some really nice work on tv lately. My tops for dolly work so far are...
NCIS:
Every shot is a dolly shot and they are all really fluid and even. A lot of the work on this show is unmotivated aesthetic movement. Knowing how a TV schedule works, I give this guy respect just for the sheer volume of set up and consistency he must deal with every day, and the ability to really pull a nice move out of every shot.
CSI:MIAMI: Really inventive work. All steady and nicely executed. A lot of pull out and boom up from under glass table type work. The kind of slick novelty shot type work that takes a pro to pull off on a TV schedule. Unless they're averaging 12 takes to a shot, this guy knows what he's doing.
LEVERAGE: The pilot was feature level work. Usually the subsequent episodes are more tightly scheduled and thus less inventive. I'm waiting to see how it pans out.
Now, with the constant reruns on A&E and TNT etc, I don't know which season some of these were (except for the new Leverage) so I may be looking at older shows.
None of these shows is the one I'm doing, and I don't personally know any of the guys doing them. (That was my little disclaimer) but it is dolly work that I have noticed as being really nicely done.
TV shows are a different breed than features. There's a lot more improvisation involved and a different director every week means you don't really get into a groove tha same as you do on a feature. You are also expected to nail it after one rehearsal and a take or two. This is part of the reason I like TV so much. It makes you a better dolly grip. You have one chance at set up and it better work. So, nice work guys. Keep it up.
On the other hand.. I've also seen some bad to awful work. "Steppy" shots. Shots that surge or stall. Compound moves that top off or bottom out in the last part of the move. Keeping in mind the tendency of editors to somehow use the one shot you don't want them to, I've looked for consistently bad work. No, I'm not going to mention the shows. We don't do that here. But they are out there. Come on boys, tighten up.
NCIS:
Every shot is a dolly shot and they are all really fluid and even. A lot of the work on this show is unmotivated aesthetic movement. Knowing how a TV schedule works, I give this guy respect just for the sheer volume of set up and consistency he must deal with every day, and the ability to really pull a nice move out of every shot.
CSI:MIAMI: Really inventive work. All steady and nicely executed. A lot of pull out and boom up from under glass table type work. The kind of slick novelty shot type work that takes a pro to pull off on a TV schedule. Unless they're averaging 12 takes to a shot, this guy knows what he's doing.
LEVERAGE: The pilot was feature level work. Usually the subsequent episodes are more tightly scheduled and thus less inventive. I'm waiting to see how it pans out.
Now, with the constant reruns on A&E and TNT etc, I don't know which season some of these were (except for the new Leverage) so I may be looking at older shows.
None of these shows is the one I'm doing, and I don't personally know any of the guys doing them. (That was my little disclaimer) but it is dolly work that I have noticed as being really nicely done.
TV shows are a different breed than features. There's a lot more improvisation involved and a different director every week means you don't really get into a groove tha same as you do on a feature. You are also expected to nail it after one rehearsal and a take or two. This is part of the reason I like TV so much. It makes you a better dolly grip. You have one chance at set up and it better work. So, nice work guys. Keep it up.
On the other hand.. I've also seen some bad to awful work. "Steppy" shots. Shots that surge or stall. Compound moves that top off or bottom out in the last part of the move. Keeping in mind the tendency of editors to somehow use the one shot you don't want them to, I've looked for consistently bad work. No, I'm not going to mention the shows. We don't do that here. But they are out there. Come on boys, tighten up.
Wednesday, January 28, 2009
Another Creep
In keeping with the "Creep" theme: A little sideline story.
A slow creep is sometime referred to as "A Mickey Rooney".
A number of years ago I did a Xmas movie of the week with Mickey. We had a scene setup following Mickey as he's chased through a mall. About 100+ of rail with a push down following and doubling back with a close up of Mickey as he "ran" past camera. Thanks to setup time and Mickey, it had to be a one take wonder.
We did 10 plus rehearsals with Mickey's stand-in - for stunt player's timing (getting knocked off escalators, etc). Then Mickey came in and watched a rehearsal. At this point I'm winded. Mickey came over and proceeded to tell me to be on my toes as he was going to me twice as fast as his 70 year old stand-in - who was chugging pretty good through all the run thrus.
I sucked it up. I tensed up - "wound up the spring" and waited for "action!"
"Action" was called and I bolted like a gun had gone off. I looked ahead in the hopes that I could keep up with Mickey. He wasn't there. I looked back. There he was, waddling along as best he could, at about 20% speed of what we had rehearsed and I could see the sweat forming on his brow.
I burst in laughter. I couldn't stop laughing - the focus puller caught the laughter bug too and fell off the dolly. The camera operator couldn't see what was going on around him and just kept shooting. There was no video assist so the director didn't know what was going on either.
On the pull back both me and the focus puller were laughing so hard that we tripped over each other and fell down. The Op just followed the puck until they called cut.
Mickey just kept on going to his trailer as he had a date with a horse. The op and director were happy with the shot... and the movie still plays every Christmas to this day.
A slow creep is sometime referred to as "A Mickey Rooney".
A number of years ago I did a Xmas movie of the week with Mickey. We had a scene setup following Mickey as he's chased through a mall. About 100+ of rail with a push down following and doubling back with a close up of Mickey as he "ran" past camera. Thanks to setup time and Mickey, it had to be a one take wonder.
We did 10 plus rehearsals with Mickey's stand-in - for stunt player's timing (getting knocked off escalators, etc). Then Mickey came in and watched a rehearsal. At this point I'm winded. Mickey came over and proceeded to tell me to be on my toes as he was going to me twice as fast as his 70 year old stand-in - who was chugging pretty good through all the run thrus.
I sucked it up. I tensed up - "wound up the spring" and waited for "action!"
"Action" was called and I bolted like a gun had gone off. I looked ahead in the hopes that I could keep up with Mickey. He wasn't there. I looked back. There he was, waddling along as best he could, at about 20% speed of what we had rehearsed and I could see the sweat forming on his brow.
I burst in laughter. I couldn't stop laughing - the focus puller caught the laughter bug too and fell off the dolly. The camera operator couldn't see what was going on around him and just kept shooting. There was no video assist so the director didn't know what was going on either.
On the pull back both me and the focus puller were laughing so hard that we tripped over each other and fell down. The Op just followed the puck until they called cut.
Mickey just kept on going to his trailer as he had a date with a horse. The op and director were happy with the shot... and the movie still plays every Christmas to this day.
Subscribe to:
Posts (Atom)

