tag:blogger.com,1999:blog-18888640.post8667658800704564128..comments2024-03-28T00:18:19.640-07:00Comments on Dollygrippery: New VideoDhttp://www.blogger.com/profile/08466991423411721535noreply@blogger.comBlogger3125tag:blogger.com,1999:blog-18888640.post-11793836659825372382008-01-27T08:33:00.000-08:002008-01-27T08:33:00.000-08:00From the initial idea of the spot until first shoo...From the initial idea of the spot until first shooting was 6 weeks.<BR/>Most of the time spend was thinking on the design and its options and disabilities. The actually design-drwaings lasted less then a day. Manufacturing some special parts and building the rig was 3 days work, 1 person.<BR/>Manteling and dismanteling the rig on the locations took us a bit over the hour. Most of time spend was lining up the camera in all its axes.. (having done one ax always seems to change the other 3...-)Anonymousnoreply@blogger.comtag:blogger.com,1999:blog-18888640.post-46461890253816809242008-01-27T06:53:00.000-08:002008-01-27T06:53:00.000-08:00Onno- how long did you have to design and then to ...Onno- how long did you have to design and then to build the rig?Anonymousnoreply@blogger.comtag:blogger.com,1999:blog-18888640.post-69341859943006382282008-01-27T03:04:00.000-08:002008-01-27T03:04:00.000-08:00here is a link to picture and drawinghttp://www.so...here is a link to picture and drawing<BR/><BR/>http://www.solidgripsystems.eu/penduleAnonymousnoreply@blogger.com